Process
From first call to interconnection in 6 to 10 weeks
Five steps and one project manager from start to finish. You always know the status, and we handle permits and the utility paperwork.
- 1Day 1
Consultation
A call or video meeting, a look at your power bills and a satellite assessment of your roof. Free, no obligation.
- 2Week 1
Site visit
We measure the roof, check shingles, structure and your electrical panel, and pick the inverter location.
- 3Within 3 days
Proposal
2–3 equipment options with a fixed price, a production forecast and payback, plus eligible rebates.
- 41–2 days
Installation
Racking, panels, inverter and disconnects, then system commissioning and app setup.
- 53–6 weeks
Interconnection
Electrical permit and inspection, micro-generation application and bi-directional meter from your wire service provider.
A typical project timeline
weeks
Rebates
Rebates and financing
Federal, provincial and municipal programs for solar, batteries and heat pumps open and close regularly - from rebates to low-interest financing repaid through property tax in participating municipalities. What applies depends on your address and timing.
- We check which programs are open for your address
- Your proposal includes the documents most programs require
- We help you file the applications
- Micro-generation credits: surplus power is credited on your bill
What the price includes
- System design and engineering
- Panels, inverter, racking and wiring
- Disconnects, grounding and labelling
- Installation and commissioning
- Permits, inspection and utility application
- Production monitoring app
- Walkthrough and handover
- 10-year workmanship warranty