From first call to interconnection in 6 to 10 weeks

Five steps and one project manager from start to finish. You always know the status, and we handle permits and the utility paperwork.

  1. 1
    Day 1

    Consultation

    A call or video meeting, a look at your power bills and a satellite assessment of your roof. Free, no obligation.

  2. 2
    Week 1

    Site visit

    We measure the roof, check shingles, structure and your electrical panel, and pick the inverter location.

  3. 3
    Within 3 days

    Proposal

    2–3 equipment options with a fixed price, a production forecast and payback, plus eligible rebates.

  4. 4
    1–2 days

    Installation

    Racking, panels, inverter and disconnects, then system commissioning and app setup.

  5. 5
    3–6 weeks

    Interconnection

    Electrical permit and inspection, micro-generation application and bi-directional meter from your wire service provider.

A typical project timeline

1. Consultation
2. Site visit
3. Proposal
4. Installation
5. Interconnection
012345678910

weeks

Rebates

Rebates and financing

Federal, provincial and municipal programs for solar, batteries and heat pumps open and close regularly - from rebates to low-interest financing repaid through property tax in participating municipalities. What applies depends on your address and timing.

  • We check which programs are open for your address
  • Your proposal includes the documents most programs require
  • We help you file the applications
  • Micro-generation credits: surplus power is credited on your bill
Solar panels on a rooftop at sunset

What the price includes

  • System design and engineering
  • Panels, inverter, racking and wiring
  • Disconnects, grounding and labelling
  • Installation and commissioning
  • Permits, inspection and utility application
  • Production monitoring app
  • Walkthrough and handover